What do you want to check?
Works on erecting the foundation:
Checking the preparation of the substrate prior to foundation installation.
Checking the foundation structure (reinforcement + formwork + geometry) before pouring the concrete mix.
Verification of the strength of reinforced concrete structures and final geometry. Reconciliation of the design and actual volume of concrete and reinforcement.
* Verification is carried out on the basis of valid SPs and design solutions.
Works on erection of bearing and enclosing wall structures:
Basic inspection before erection
Checking the quality of erection of bearing (columns, pylons, partitions) and enclosing (walls, partitions) structures; reinforcement belts.
Checking the layout and quality of the floor slab before acceptance of the concrete mix, in the case of monolithic slabs, and after the precast slab is installed.
Checking the quality of erection of load-bearing and enclosing structures of the 2nd and 3rd floors; reinforcement belts; work safety. Reconciliation of work volumes.
Works on erection of load-bearing structures of covering and roofing:
Inspection of mauerlate and rafter system arrangement, cover slab arrangement, monolithic cover slab.
Check the insulation and waterproofing and vapor barrier measures.
Checking the installation device of the finish roof covering of the drainage system.
Separate types of work depending on the need for control in the current moment:
Construction supervision of façade systems.
Construction supervision of the drainage and dewatering system.
Construction supervision of window and door opening filling.
Construction supervision on the installation of heating equipment.
Construction supervision of water and sewer installation.
Construction supervision of finishing work.
Construction supervision of landscape work and landscaping.
Other inspections of work stages according to your terms of reference